If your property lies within an area designated as the Casper Aquifer Protection Zone (CAPZ), any septic field that is to be installed in that area will have to be designed by a Professional Engineer or a Professional Geologist, licensed to practice in Wyoming and qualified to do such work. An electrical engineer, for example, may not have the requisite skills for this undertaking.  The engineer/geologist should contact the County Water and Wastewater Engineer for guidance regarding what will be expected.


Download Fee Schedule

Zoning Certificate – Same Land Use

Mobile Home $50.00
Residence/Principal Structure $100.00
Accessory Structure $50.00
Rural Address $75.00
Change in Land Use (zone change) $300.00
Conditional Use Permit $300.00


Zoning Certificate – Outdoor Signs

On-premise $50.00 + $2.oo/sq. ft.
Off-premise $100.00 + $2.oo/sq. ft.


Subdivisions

Subdivision Permit The greater of $400.00 or $50.00 per lot
up to maximum of $2500.00


Public Notice

Notice Fee - (applies to subdivisions, variance, conditional use, land use change, Tower and WECS) $100.00


Towers

Temporary Towers $50.00
Small Wind Energy Systems $50.00
Commercial Wind Turbines (WECS) $300.00 per turbine
Tower Permit $200.00
C0-Location Tower Permit $50.00


Small Wastewater

Small Wastewater Application $300.00 + Mileage Fee (see below)
  ($100.00 late fee for construction prior to approval to install)  
Wastewater Installer and Hauler Licensure $75.00


Other Permits

Variances $200.00
Floodplain $200.00
Mobile Home Park Annual License $150.00 + $7.50 per lease space


Mileage Fee

Zone 1 $0.00
Zone 2 $25.00
Zone 3 $75.00